After cutting the sides of the quartz slab, it enters the calibrating machine through the conveyor belt of the frame components. The required thickness of the first slab is determined by adjusting the upper and lower positioning devices of the calibrating head lifting assembly. When calibrating the slab with this thickness later, the calibrating head can be directly lowered.
When the quartz slab passes under the calibrating head, the calibrating head starts rotate while the diamond tools start rotate through the motor ,and calibrate the quartz slab to the required thickness.
Thickness of processed slab (mm)
15-40
Width of processed slab (mm)
1500-1680
Number of calibrating head(set)
6
Power of unit calibrating head (kw)
34(20*1.7kw)
Power of unit calibrating head revolution(kw)
4
Power of lifting of unit calibrating head (kw)
2.2
Main drive power (kw)
4
Speed of conveyor belt (m/min)
1-8
Air pressure (MPa)
0.6-0.8
Total power (Kw)
245.2
Dimension of conveyor belt (mm)
1700*8.9*30100
Overall dimension of machine (mm)
14850*2997*2430
Total weight (Kg)
35000